Front end technology key components

  • Silicon on pre-production models based on PT measurements
  • Technology platform qualification/reliability/robustness criteria met
  • Technology Platform Qualification Vehicle functionality through corner lot characterization
  • Key PPAP documents (final version of process flow, control plan, PFMEA), CPK’s, R&R results and assembly design rules updated
  • Evidence of EWS testing capability and back end process compatibility for volume production provided
  • Measurement Equipment Capability provided
  • Evidence of front end production capability provided and DFM rules updated if necessary

     

Back end technology development key components

  • Validation phase results meet quality, reliability and industrial robustness performance criteria
  • Reliability qualification plan and line stressing completed
  • Key PPAP documents (final version of process flow, control plan, PFMEA), CPK’s, R&R results and assembly design rules updated
  • Characterization of critical assembly process steps using Design of Experiment (DOE)
  • FMEA, flow chart, control plan and documents updated with the lessons learnt in the execution of prototypes, pre-series and production risks
  • Manufacturing Execution System (MES) set-up for manufacturing requirements (flow chart, control plan, yield management, logging management, people certification control…)
  • Net Equipment Efficiency (NEE) of the line optimized to anticipate potential manufacturing vulnerabilities

     

Product development key components

  • Successful completion of the product qualification plan
  • Secure product deliveries on advanced technologies using stress methodologies to detect potential weak parts
  • Successful completion of electrical characterization
  • Global evaluation of new product performance to guarantee reliability in our customers’ manufacturing process and in the final application of use (mission profile)
  • Final disposition for product test, control and monitoring

     

×